DESCRIPTION
FORD PANTHER ENGINE ASSEMBLY LINE
- hardware and software preparation,
- ABB robots programing and commissioning stations
RESPONSIBILITIES
- pneumatic and electric plans for 18 stations (ePlan P8)
- software preparations and commissioning on customer site 3 stations on cylinder head line (2 semi-auto, 1 auto),
13 automatic stations on main line (RTV stations, load and offload block, leak test, engraving, rundown)
Used Safety PLC Simatic S7-319-2 PN/DP and HMI panels Siemens MP 277 10″ Touch, based on Simatic Step7and WinCC Flexible 2008 software.
Profinet network, based on ET200Eco modules, with I/O and RFID extensions.
Robots KUKA
Nutrunners Atlas Copco
Safety systems PILZ.
Cameras and Light curtains SICK.